Hi everybody,
I had an idea about doors -- what if instead of a sliding door, I used a French door, the kind with window panes and 2 panels opening out.
If the 2 sides would open to 180 degrees, then it would accomplish my original objective of being able to keep the door open on a regular basis. Plus, I like French doors, and I would like the extra light. I think they come with frosted glass, so that would be enough privacy. Or I could get clear glass and use a tapestry as needed.
Anyway, here is a link:
http://tinyurl.com/38qwgx
so you can see what it-looks like.
Saturday, December 8, 2007
Friday, December 7, 2007
Dec 7 - Staining the Floor
Jerrshon and I stained the floor today. this is at lightest stain you can get ("natural"). It looks nice -- much warmer. We almost stained ourselves into a corner -- twice. What's up with that?! Also, we left windows open that were unreachable without stepping on stain. However, Jerrshon did some cool Parkour moves including wall-walking and pushups off the window frame, and got them shut.
Dec 5 - The Radiator Gets Moved.
The radiator-moving went fine. We talked it back and forth and eventually the second guy who came with suggested putting it diagonal and that's what they did. They also kept all the pipes above the floor, which will be under my bed. So, "no floor was harmed in the moving of this radiator." (Although some water got spilled so Stacy and I will have to smooth it over.)
They also found out that the reason our radiators weren't working was that then was no water pressure on the 2nd floor. This was because some genius turned off the feeder valve to the boiler, probably 1-2 years ago, and water that escapes has been not being replaced since then. So now the radiators upstairs are hot and the rooms are approaching being warm.
The plumber (his name was Charly) was absolutely amazed that we actually got the floor done-told me about 5 times that he never expected to see it all sanded. I told him we would have stained it too if he hadn't been coming !!
Wednesday, December 5, 2007
December 3 - Tale of 3 Floors
So here is what the floor looked like when we started. As you can see, we had already done the edging. We had also, believe it or not, already hand-scraped the floor (this is Kiimmara'sroom.)
Thisis Jerrshon's room after the first pass with the belt sander; we had done the front of the room twice and the back of the room once. So the remaining stuff had to be cleaned up using the edge with 36 sandpaper.
Finally, the finished product. The whole project was harder than it should have been because we couldn't get the right belts (16 grit) but had to make do with 24 grit. Erin made A LOT of phone calls but no one here seems to have heard of 16 grit belts. Very odd.
Anyway, we're going to stain tomorrow night and poly over the weekend.
Saturday, December 1, 2007
Nov 30 - The Floor
We decided to switch gears and work on the floor. So, we cleaned out Kiimmara and Jerrshon's room, which included disassembling Jerrshon's desk. Then we pulled up the old floor. This went very easily until... dun dun dun ... Kiimmara's room, where we have to chip it up bit by tiny bit. We also tried a solvent to get the gummy stuff off but that didn't do much, so we're just going to blast through it with the 16-grit... tomorrow
Nov 28 - More Drywall
We got some more significant pieces of drywall up today. Getting it above the rafters onto the ceiling proved to be a bit of a chore. We had to go out and buy a second step ladder, and have 2 people on ladders plus one standing below pushing with a stick.
Jershon started tearing down the wall between his room and the closet. It turns out to be quite a trouble. First he had to get the shelves and rods out. Then, the inside wall of the closet was a thin (quarter-inch?) plywood, and it extended past what he was trying to pull out, so he had a saw it down. Then there were about 6 pieces of framing lumber and an outlet (since moved). We're still working on the baseboard. The pipe in the wall is cast iron and can't be removed (it vents the toilets). So the now-former closet will be a sort of entry way for him. 
Nov 28 - The First Drywall
One thing about old wood-framed houses -- a lot of idiosyncracies, irregularly spaced rafters, rafters and joists that don't line up, holes left in the floor -- all sorts of little problems to solve. We spent the day fixing some of them, like the missing bits of plank in the crawl space, which had to be braced from below and then fitted with 2 specially cut pieces of plywood (Stacy did most of this):
And adding extra framing to fasten the drywall between rafters. Finally, the first piece of drywall went up after dinner.
Nov 26 - Space Clearing
Erin and I did more clearing out. We moved a dresser and a bookshelf and this old air conditioner. Actually the air conditioner is fine, I'm just hoping that with my new ceiling fan, I won't need an air conditioner. 1) I hate the sound 2) I hate the way it looks 3) It would be right in front of my bed. So now you will be able to see the bamboo not only from my bed but also from the landing on the first floor.
Subscribe to:
Posts (Atom)